September 2, 2010  




:: reports, protocols, & scopes of work

::   home  

This section contains a list of reports, protocols and scopes of work. Most of the files listed below are in pdf format and require acrobat reader:


Protocols/Scopes of Work
Community Energy Efficiency Program

Air Sealing

Quality Caulking and Sealing - Contractor Scope of Work


HVAC
Procedures for HVAC System Design and Installation and Scope of Work

Insulation
Quality Installation of Insulation - Contractor Scope of Work


Sliding Glass Door Installation Procedures
Standard Practice for Installation of Sliding Glass Doors with Integral Mounting Flange in Wood Frame Construction

Window Installation Procedures
Standard Practice for Installation of Windows with Integral Mounting Flange in Wood Frame Construction


California Green Builder
Vist http://www.cagreenbuilder.org for California Green Builder Documentation


Photovoltaic Protocols
Procedures for Solar Electric System Design and Installation - Introduction
Procedures for Solar Electric System Design and Installation - Background
Procedures for Solar Electric System Design and Installation - Scope of Work
Procedures for Solar Electric System Design and Installation - Checklist

Reports/Studies

Community Energy Efficiency Program (CEEP)
The Southern California Local Government Community Energy Efficiency Program

Million Solar Roof (MSR)
Million Solar Roof Final Report